Please take a look at https://discuss.ocaml.org/t/opam-repository-archival-next-run-scheduled-2026-01-01/ for the next run. This time we include detailed instructions on how to test the opam-repository without the archived packages for your setup (and your CI system). This way you can provide feedback which packages should be retained. Thanks a lot.
hannes
22
Related topics
| Topic | Replies | Views | Activity | |
|---|---|---|---|---|
| Opam repository archival, phase 2 - OCaml 4.08 is the lower bound | 21 | 990 | February 26, 2025 | |
| Opam repository archival, Phase 1: unavailable packages | 6 | 601 | January 1, 2025 | |
| [archival] [ann] Raising the OCaml lower bound to 4.11.0 for opam-repository | 10 | 325 | April 27, 2026 | |
| Opam repository archival, next run (scheduled 2026-01-01) | 9 | 393 | April 8, 2026 | |
| Opam-repository: security and data integrity posture | 15 | 2198 | October 5, 2020 |